Check-in Number:
|
625 | |
Date: |
2001-Aug-08 15:14:50 (local)
2001-Aug-08 13:14:50 (UTC) |
User: | simons |
Branch: | |
Comment: |
Bumped milestone (1) to 100% fulfilled: As far as I can see, the EVAL
file is complete. |
Tickets: |
|
Inspections: |
|
Files: |
|
ossp-pkg/srpc/TODO 1.12 -> 1.13
--- TODO 2001/07/31 16:03:01 1.12
+++ TODO 2001/08/08 13:14:50 1.13
@@ -3,7 +3,7 @@
o M1 (peti) [11-Jun-2001]
- evaluation checklist for XDS and AMP
- done: 50% [-> EVAL]
+ done: 100% [-> EVAL]
o M2 (peti+rse) [25-Jun-2001]
- design/architecture paper (authentication+encryption framework)
|
|
ossp-pkg/xds/TODO 1.12 -> 1.13
--- TODO 2001/07/31 16:03:01 1.12
+++ TODO 2001/08/08 13:14:50 1.13
@@ -3,7 +3,7 @@
o M1 (peti) [11-Jun-2001]
- evaluation checklist for XDS and AMP
- done: 50% [-> EVAL]
+ done: 100% [-> EVAL]
o M2 (peti+rse) [25-Jun-2001]
- design/architecture paper (authentication+encryption framework)
|
|